Disabled Access Ramp for a Local Primary School

Primary School Access Ramp Project

Turning an unused grass bank into a safer, more inclusive school entrance

When we first arrived on site, there was a steep grass bank and a large area of waste ground, neither of which was of any use to the school. We’ve now transformed it into a brand new 60m disabled access ramp for a local primary school, improving accessibility and creating a safer, more inclusive environment for pupils, staff and visitors.

The scheme took the site from raw ground to a fully finished route. It covered excavation into the bank, foundations, retaining walls, surfacing and edging, all built to a high standard and designed to last.

Cutting a 60m ramp into an existing bank takes careful planning and good groundwork. Our team worked through the excavation and foundation stages and then built up the walls and surfaces, and the result is a smooth, practical route that really does make a difference to everyday school life.

Key work undertaken

    Excavation & groundworks

    Excavating into the existing grass bank

    Clearing waste ground and removing soil

    Forming the ramp’s route and levels

    Preparing the formation for concrete foundations

    Foundations & retaining walls

    Laying concrete strip foundations

    Building blockwork retaining walls

    Facing the walls in red brick, with brick-on-edge copings

    Building a low brick dividing wall in the same style

    Surfacing & finishing

    Laying a smooth tarmac surface along the full length of the ramp

    Fitting timber edging to the planting areas

    Spreading topsoil, ready for landscaping

    Handrails: bespoke handrails are currently being fabricated for the ramp

Another transformation completed by the TCS Plant team. Great work from start to finish by everyone involved, creating a lasting improvement for the school community.