A lasting place of remembrance on Swansea Bay, built in 12 working days

Some projects mean more than others. Swansea’s permanent COVID-19 memorial sits on the promenade near the Slip Bridge, overlooking Swansea Bay. Created by Swansea Council, it provides a quiet, accessible space for reflection and remembrance. It was unveiled on 25 September 2026, and we were proud to deliver the works as main contractor.

Designed by Welsh glass artist Catrin Jones and sculptor Angharad Pearce Jones, the memorial was shaped by engagement with local people, organisations and groups affected by the pandemic. It stands as a lasting tribute to those who lost their lives, and to the families, friends and communities affected by COVID-19.

Our team had just 12 working days to complete the works from start to finish. The site was open parkland by the seafront, so it needed careful planning, tidy working and close coordination between trades. The standard of workmanship was excellent throughout, with every stage completed right first time so the next could follow on without delay.

Key work undertaken

    Excavation & preparation

    Setting out and excavating the memorial base

    Stripping turf and removing soil

    Trimming and preparing the formation

    Securing the site with fencing throughout

    Reinforced concrete base

    Laying membrane and steel reinforcement mesh

    Fixing spacers to hold the mesh at the correct depth

    Pouring ready-mix concrete to line and level

    Checking levels with laser equipment

    Finishing & completion

    Handing over a level, high-quality base for the finishing trades

    Close coordination with A1 Resin Ltd for the resin finish

    Reinstating the surrounding area on completion

It has been a proud project to be involved in, creating a lasting place of remembrance for the whole community. A huge well done to everyone who played their part in completing it to such a high standard in such a short timeframe. Thank you also to our subcontractor A1 Resin Ltd for their immaculate resin finish.