A safer, smoother school entrance, repaired right first time
The main entrance at Cefn Hengoed Community School had become a problem. The surface was full of potholes, cracks and worn patches, which made the approach uncomfortable and unsafe for everyone using it each day, from pupils and parents to staff and delivery drivers.
Our team has now planed out and resurfaced the worst-affected areas, giving the school a smooth, level and much safer entrance. This was a targeted repair, but we deliver the same quality, pride and workmanship on every job, whatever its size.
Work like this relies on good preparation. Each defective area was marked out, cut out and planed back to a solid base before the new material went in, so the repair blends with the surrounding surface and the edges are neat and sealed. The works were also planned around the school entrance, so that disruption stayed to a minimum.
Key work undertaken
Survey & preparation
Marking out the defective and potholed areas
Cutting out and planing the worn surface
Removing arisings and cleaning the planed areas
Preparing the edges for a tidy, durable join
Resurfacing
Laying new tarmac in the planed sections
Hand-finishing around kerbs, drains and road markings
Rolling and compacting for a firm, even surface
Sealing the edges and joints against the elements
Safety & finish
Leaving a smooth, safer surface for pedestrians and vehicles
Working around the school gates, parking bays and yellow lines
Leaving the site clean and tidy for the school day
Another quick, tidy job for the TCS Plant Hire team, with a really noticeable difference for the school community. Thank you to everyone involved.