Restoring a collapsed river bank cycle path – safely back open for all
When a large fallen tree caused a section of river bank cycle path to collapse, the route quickly became unsafe for both pedestrians and cyclists. The structural failure of the bank left a dangerous void and unstable ground, requiring immediate intervention to prevent further deterioration and restore safe public access to this well-used route.
TCS Plant Hire Ltd was brought in to carry out the full reinstatement works – from the safe removal of the fallen tree and clearance of debris through to the stabilisation of the river bank and full reinstatement of the cycle path surface. With over 40 years of experience in civil groundwork across Swansea and West Glamorgan, our team delivered a safe, durable and high-quality result that has returned this important route to full use.
the scale of the collapse presented a significant challenge on site. Working in difficult conditions alongside the river bank, the TCS Plant Hire Ltd team carefully excavated the failed section, cleared the extensive root system left by the fallen tree and methodically rebuilt the bank formation from the ground up – all whilst maintaining a safe working environment in a confined and sensitive riverside location.
Key work undertaken on the river bank cycle path reinstatement
Tree removal & clearance
Safe felling and removal of the fallen tree
Full clearance of root system and debris
Removal of displaced bank material and spoil
Site made safe prior to reinstatement works
River bank stabilisation
Excavation and removal of collapsed bank material
Structural reinstatement of the river bank formation
Compaction of new sub-base to engineered specification
Bank edge secured to prevent future erosion
Cycle path reinstatement
Full reinstatement of cycle path sub-base layers
High-quality surface course laid to falls
Path edges and margins reinstated and secured
Smooth, safe finish restored for public use
The river bank cycle path reinstatement is a brilliant example of TCS Plant Hire’s ability to respond to unexpected and challenging groundwork situations. From fallen tree to fully reinstated path, our team worked efficiently and professionally to restore a safe, high-quality route – getting this well-loved walkway back open for the local community as quickly as possible.